Thursday, September 15, 2005

Done
I put the last pieces of cedar trim on last weekend, so the only thing left are steps. One running the entire length of the deck (far left of photo), one 6 foot section near the garage and a 4 foot section by the edge of the house. Zoe really enjoys jumping on and off the deck, as well as lounging in the sun.

Next up: about 300 square feet of white gravel, some boulders and some fieldstone for the Japanese garden. Hopefully all before the ground is frozen solid and covered with snow.

No comments: